This page is dedicated to the detailed construction of a single story extension of 35 Square Meters in Size.

wbs.westmount@ntlworld.com


All visitors are most welcome.

Regards Richard
WBS @ Westmount
wbs_IMG_8035
wbs_IMG_8036
wbs_IMG_8037
wbs_IMG_8038
wbs_IMG_8039
wbs_IMG_8044
wbs_IMG_8046
wbs_IMG_8047
wbs_IMG_8048
wbs_IMG_8050
wbs_IMG_8051
wbs_IMG_8053
wbs_IMG_8054
wbs_IMG_8055
wbs_IMG_8056
wbs_IMG_8059
wbs_IMG_8060


Work carried out during the main JCB summer shutdown 25/06/2011

First Fix Electrics to part  "P" Certification required for buildings inspector.

We require a part "P" certificate to be supplied by the electrical engineer to issue to the buildings inspector

This will become part of the final extension sign off on completion.

Shaun  O’Neill   ( Self Employed )  O’Neill   Electrical  visited our house and successfully quoted a competitive price for the electrical installation of our extension.

I cut out all the walls for the socket and switch positions with guidance from Shaun of extra requirements to satisfy the Part "P" regulations.

Shaun has now completed the first fix prior to the plastering being done.



Shaun has done a great job and was a pleasure to work. His quality of work was very high and even was even noticed by the plaster who commented on the tidy work Shaun had done.