Construction of Floor base and insulation in preparation for the laying of the concrete slab floor

These pictured cover the levelling of the ground base, Sand, DPM plus insulation. Next step is to arrange for delivery of 5 cubic meters of concrete to lay the floor.

Concrete Slab Laid on Saturday 11/06/2011


Dave Hopwood came on Saturday morning to help with the initial lay and tamping to the levels.

His help on the day was greatly appreciated. (Thanks Dave)

I would like to thank everyone for their help on Saturday 11/06/2011.


Just a Few Bits of Useless Information

5 cubic meters of Ready Mix
135 Wheel Barrows
14m Long
2.7m Average Width
135mm Deep

4 Tamper Joists To Cover Different Widths Of Room

45 Minutes To Unload Concrete

Easy Float Modified With Extension Pole To Reach Half Way Point


Started Job at 9AM
Finished Troweling Flat 10:30pm

Long Day!


Current plan delivery date is 11/06/2011
(
Delivered and Laid to time plan)


The Job Is now finished !



Now i can move on with the erection of the internal walls and electrics


wbs_IMG_7733
wbs_IMG_7735
wbs_IMG_7736
wbs_IMG_7741
wbs_IMG_7742
wbs_IMG_7744
wbs_IMG_7759
wbs_IMG_7765
wbs_IMG_7767
wbs_IMG_7768
wbs_IMG_7770
wbs_IMG_7771
wbs_IMG_7775
wbs_IMG_7776
wbs_IMG_7779
wbs_IMG_7781
wbs_IMG_7783
wbs_IMG_7785
wbs_IMG_7786
wbs_IMG_7788
wbs_IMG_7790
wbs_IMG_7791
wbs_IMG_7804
wbs_IMG_7808
wbs_IMG_7810
wbs_IMG_7812
wbs_IMG_7813
wbs_IMG_7815
wbs_IMG_7821
wbs_IMG_7824
wbs_IMG_7826
wbs_IMG_7828
wbs_IMG_7831
wbs_IMG_7832
wbs_IMG_7833
wbs_IMG_7845
wbs_IMG_7847
wbs_IMG_7848
wbs_IMG_7851
wbs_IMG_7855
wbs_IMG_7856
wbs_IMG_7857
Hit Counter

Please Take Me Back To Main WBS Page