Actions Speak Louder Than Words !
This page is dedicated to the detailed construction of a single story extension of 35 Square Meters in Size.






Project Started On

Saturday 24/07/2010












I will add pictures and cost information of this build. If you have any questions or would like me to add any specific information please contact me with you request.

I will cover all aspects of this build from footings to signoff by the buildings inspector.

I hope you find some of the information useful on this page.





wbs.westmount@ntlworld.com


All visitors are most welcome.

Regards Richard
WBS @ Westmount
wbs_layout
wbs_3d
wbs_3d-2
wbs_3d-3
Extension Layout
Annex-Layout
Please click on the image above to see full size
Update on the 19/06/2011

Well another week has passed and the extension completion moves ever closer.

This weekend we have had a bit more of a relaxing time after laying the concrete floor last weekend.

we have spent some time looking at the Outstanding jobs and how they all line up with the next key Job

PLASTERING!


Some Key facts about this plastering Project

Total Plastering Area 180m2

63.2m2 of Skim only
117.6m2 Float and Skim

20 Bags of 25kg Skim Plaster
40 Bags of 25Kg Hard wall Plaster



(Estimate 5 days 2 Men)


The Best Workto List Ever !

Below you will see my work To project list. The column on the left represents the Pre and Post plastering Jobs.

This is to allow me to estimate the date i need to book the plaster for.

Currently I have an estimated 220 Hours of work with my Name next to it, So the next few months are going to be rather busy.

I will update the list on a weekly basis to allow visibility of the tasks in progress.

I would have liked to have booked the plaster for the last week of my main shutdown

Week commencing the 08/08/2011 but for me to be able to complete 220 Hours between 19/06/2011 and the 08/08/2011 is going to place a lot of pressure on me to complete.

So my estimate is to book the plasterer for a date before the September Shutdown 26/09/2011

I will be working closely to this Project plan over the next few weeks




Project Plan Updated on the 08/01/2012



Hit Counter

Please Take Me Back To Main WBS Page
New
New Section 29/01/2012

Download Link Below
New download available of my full cost data sheet for my extension

How much has my 35 Square Meter Extension Cost ?
Final Certificate Issued  06/06/2012